

| Subject: | Future propane changes planned. Prepare in advance? |
| From: | Scott Chapman |
| Date: | Mon, 19 Apr 2010 13:32:05 -0400 |
I am plumbing in my new propane tank and decided to pull the copper tubing as well and replace it. In the future I'm planning to add a Propex heater (not sure where yet) and possibly a second propane tank. So, I'm thinking that I should put in a 4-way now and cap unused ways so I don't have to break these lines again in the future. Good plan? Also, why do they run 2 small lines from tank to fridge & stove rather than one line up and T it off inside? I assume you'd need a bigger line up to the T to handle the greater volume and "off to the races". Having not dealt with natural gases in the past, I'm wondering what the design reasoning is here. Happy Trails, Scott
Have something to add on this topic today? Revive this thread in the forum »