

| Subject: | Re: Used Radiator Inspection? |
| From: | Dave Mcneely |
| Date: | Tue, 7 Jan 2014 06:52:03 -0600 |
The plastic tower on my 1991 Volkswagen Vanagon GL Campmobile lasted 155k miles before it failed in a hose replacement. So, I thought that was pretty good, and considering the price difference for metal versus plastic replacement, bought another one. mcneely ---- Neil N <musomuso@GMAIL.COM> wrote: > yes. This is what I was anticipating. Drilling holes on a SS tube > would be tough. Especially for a novice like me! > > And for sure. Wondered about using aluminum. I wonder why the likes of > GW didn't do same? > > On 1/6/14, Alistair Bell <albell@shaw.ca> wrote: > > > The welding is not the hard part of this playtime, what would give you some > > fun is cutting the birds mouths and corresponding holes in the tubing. > > > > Neil, why not use aluminum to make the tower? Easier material to work with > > and you got plenty of aluminum in the cooling system already. > > > > Alistair > > > > > > > >> On Jan 6, 2014, at 7:00 PM, "SDF ( Scott Daniel Foss )" > >> <scottdaniel@TURBOVANS.COM> wrote: > >> > >> people fabricate assemblies out of stainless steel quite commonly. > >> more welding than drilling for sure .. > >> but many custom parts are tig welded up in stainless. > >> > >> my welder fabricator guy .. > >> making one of those would be child's play for him. > >> > >>> On 1/6/2014 4:38 PM, Neil N wrote: > >>> Interesting. Looks similar to the stamp on the heat exchange box > >>> behind dash. Good tips. Thanks. A manufacture and assembly date. > >>> > >>> As for a stainless steel coolant distribution tower, uh no. That metal > >>> would be a PITA for someone w/o the right tools. Metal's too hard. > >>> Maybe use mild box steel? Easier to drill and mate the pipes to it. > >>> > >>> Neil. > >>> > >>> > >>>> On 1/6/14, mark drillock <mdrillock@cox.net> wrote: > >>>> > >>>> That date looks ok to me. The newest van is 22 years old. That rad is > >>>> only 10 years and it may have been on the shelf for a while before it > >>>> was ever installed. > >>>> > >>>> In addition to that label with a full date there is a molded in date on > >>>> the plastic side tank near the bleeder. > >>>> > >>>> Mark > >>>> > >>>> > >>>> Neil N wrote: > >>>>> https://lh4.googleusercontent.com/-ZOo3U-FfYfs/UssYRGTEYJI/AAAAAAAAIuM/7kc-Jv5RzuQ/s800/rad%2520date.jpg > >>> > >>> -- > >>> Neil n > >>> > >>> Blog: tubaneil.blogspot.ca > >>> > >>> '88 Westy http://tinyurl.com/c8rlw6p > >>> > >>> '81 VanaJetta 2.0 "Jaco" http://tubaneil.googlepages.com/ > >>> > >>> Vanagon VAG *Gas* inline-VR Engine Swap Group: > >>> > >>> http://tinyurl.com/d7gd5ej > >>> > > > > > -- > Neil n > > Blog: tubaneil.blogspot.ca > > '88 Westy http://tinyurl.com/c8rlw6p > > '81 VanaJetta 2.0 "Jaco" http://tubaneil.googlepages.com/ > > Vanagon VAG *Gas* inline-VR Engine Swap Group: > > http://tinyurl.com/d7gd5ej -- David McNeely
Have something to add on this topic today? Revive this thread in the forum »